TM 5-2420-231-23-3
0233
RIGHT-HAND TUBES INSTALLATION CONTINUED
6. Connect hose (Figure 22, Item 3) to tube (Figure 22, Item 2).
7. Connect hose (Figure 22, Item 4) to tube (Figure 22, Item 1).
Figure 22. Loader Lift Cylinder Hydraulic Tubes.
0233
8. Install washer (Figure 23, Item 3), bolt (Figure 23, Item 2), spacer (Figure 23, Item 5), clamp
(Figure 23, Item 4), right hose cover (Figure 23, Item 1), new lockwasher (Figure 23, Item 6), and nut
(Figure 23, Item 7) on machine.
Figure 23. Right Hose Clamp.
0233