TM 5-2420-231-23-3
0233
RIGHT-HAND TUBES INSTALLATION
0233
NOTE
Route loader lift cylinder hydraulic tubes as noted during removal.
Install lines as tagged and marked during removal.
Remove plugs and caps from hoses and fittings.
1. With assistance, install two tubes (Figure 19, Items 4 and 3) on machine.
2. Connect tube (Figure 19, Item 3) to fitting (Figure 19, Item 2).
3. Connect tube (Figure 19, Item 4) to fitting (Figure 19, Item 1).
Figure 19. Tubes (Right-Hand).
0233