TM 5-2420-231-23-3
0260
END OF TASK
CLEANING AND INSPECTION
0260
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
ASSEMBLY
0260
NOTE
Install fittings and solenoids as noted during removal.
1. Instal new O-ring (Figure 3, Item 9) and safety relief valve (Figure 3, Item 8) on coupler solenoid valve
(Figure 3, Item 21).
2. Install new O-ring (Figure 3, Item 19) and fitting (B) (Figure 3, Item 20) on coupler solenoid valve (Figure 3,
Item 21), tighten nut (Figure 3, Item 18).
3. Install new O-ring (Figure 3, Item 4) and fitting (P) (Figure 3, Item 5) on coupler solenoid valve (Figure 3,
Item 21), tighten nut (Figure 3, Item 3).
4. Install new O-ring (Figure 3, Item 2) and fitting (T) (Figure 3, Item 1) on coupler solenoid valve
(Figure 3, Item 21).
5. Install four new O-rings (Figure 3, Item 7) and fittings (LS, A, A, and B) (Figure 3, Item 6) on coupler solenoid
valve (Figure 3, Item 21).
6. Install four new O-rings (Figure 3, Item 17) and two valves (Figure 3, Item 15) on coupler solenoid valve
(Figure 3, Item 21).
7. Install two solenoids (Figure 3, Item 16) and new locknuts (Figure 3, Item 14) on valves (Figure 3, Item 15).
8. Install two new O-rings (Figure 3, Item 10) and valves (Figure 3, Item 12) on coupler solenoid valve
(Figure 3, Item 21).
9. Install solenoid (Figure 3, Item 11) and new locknut (Figure 3, Item 13) on valve.
END OF TASK
0260-5