8
TM 5-2420-231-23-3
FIELD MAINTENANCE
-
BOOM LATCH CABLE REPLACEMENT
029
5
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References - Continued
Tools and Special Tools
Tool Kit, General Mechanic's
0
0
Equipment Conditions
Materials/Parts
Backhoe extended and lowered to ground
0
(TM 5-2420-231-10)
0
Cotter Pin
0
0
Lockwasher (7)
Estimated Time to Complete
0
References
2.3 hr
0
0
REMOVAL
0295
1. Remove bolt (Figure 1, Item 3), lockwasher (Figure 1, Item 8), washer (Figure 1, Item 4), cable (Figure 1,
Item 1), spacer (Figure 1, Item 7), washer (Figure 1, Item 5), and spacer (Figure 1, Item 6) from latch assembly
(Figure 1, Item 2). Discard lockwasher.
Figure 1. Cable Mount.
0295