• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. A/C Hoses.
Figure 9. Pressure Switch.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1017    1018    1019    1020    1021  1022  1023    1024    1025    1026    1027  
img
.
TM 5-2420-231-23-3
0361
INSTALLATION CONTINUED
4. Install new O-ring (Figure 7, Item 5) on A/C tube (Figure 7, Item 1) and connect A/C tube to expansion valve
(Figure 7, Item 4).
5. Install new O-ring (Figure 7, Item 3) on A/C tube (Figure 7, Item 2) and connect A/C tube to expansion valve
(Figure 7, Item 4).
Figure 7. Expansion Valve Connection.
0361
6. Install butyl tape (Figure 8, Item 1) on A/C tubes (Figure 8, Item 3) and expansion valve (Figure 8, Item 4).
7. Install new tiedown straps (Figure 8, Item 2) on A/C tubes (Figure 8, Item 3).
Figure 8. Butyl Tape.
0361
0361-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.