TM 5-2420-231-23-3
0361
INSTALLATION CONTINUED
4. Install new O-ring (Figure 7, Item 5) on A/C tube (Figure 7, Item 1) and connect A/C tube to expansion valve
(Figure 7, Item 4).
5. Install new O-ring (Figure 7, Item 3) on A/C tube (Figure 7, Item 2) and connect A/C tube to expansion valve
(Figure 7, Item 4).
Figure 7. Expansion Valve Connection.
0361
6. Install butyl tape (Figure 8, Item 1) on A/C tubes (Figure 8, Item 3) and expansion valve (Figure 8, Item 4).
7. Install new tiedown straps (Figure 8, Item 2) on A/C tubes (Figure 8, Item 3).
Figure 8. Butyl Tape.
0361