• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. O-Ring.
A/C SYSTEM SERVICE

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1029    1030    1031    1032    1033  1034  1035    1036    1037    1038    1039  
img
. . .
TM 5-2420-231-23-3
0363
INSTALLATION CONTINUED
2. Install high-pressure sensor (Figure 3, Item 3) on A/C hose (Figure 3, Item 4).
3. Connect high-pressure sensor connector (Figure 3, Item 2) to machine wiring connector (Figure 3, Item 5).
4. Install new tiedown strap (Figure 3, Item 1) on wiring connectors (Figure 3, Items 2 and 5) and A/C hose
(Figure 3, Item 4).
Figure 3. High-Pressure Sensor.
0363
END OF TASK
FOLLOW-ON TASKS
0363
1. Install hood radiator screen and bumpers (WP 0304).
2. Recharge A/C system (WP 0364).
END OF TASK
END OF WORK PACKAGE
0363-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.