• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Receiver/Dryer.
A/C RECEIVER/DRYER REPLACEMENT - Continued

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1038    1039    1040    1041    1042  1043  1044    1045    1046    1047    1048  
img
. .
TM 5-2420-231-23-3
0365
CLEANING AND INSPECTION
0365
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
END OF TASK
INSTALLATION
0365
WARNING
Refrigerant oil is slippery. Wipe up any spills immediately. Failure to follow this warning
may result in injury to personnel.
NOTE
A/C O-rings are lubricated with refrigerant oil prior to assembly.
Install A/C lines as noted during disassembly.
Install receiver/dryer with flow direction noted during disassembly.
1. Add 0.70.8 oz (2025 cc) of refrigerant oil from a sealed container to receiver/dryer (Figure 2, Item 2).
2. Install two clamps (Figure 2, Item 4) and receiver/dryer (Figure 2, Item 2) on two holding brackets
(Figure 2, Item 5).
3. Lubricate new O-rings (Figure 2, Items 1 and 3) with refrigerant oil from a sealed container and install O-rings
on receiver/dryer (Figure 2, Item 2).
4. Connect output A/C hose (Figure 3, Item 3) to fitting (Figure 3, Item 4).
5. Connect input A/C hose (Figure 3, Item 1) to fitting (Figure 3, Item 2).
Figure 3. A/C Hose.
0365
END OF TASK
0365-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.