Figure 1. Starter Removal and Installation.
SWITCH REPLACEMENT

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  394    395    396    397    398  399  400    401    402    403    404  
img
. .
TM 5-3805-255-14
0041
CLEANING AND INSPECTION
00041
Clean and inspect all components IAW General Maintenance Instructions (WP 0019).
END OF TASK
INSTALLATION
00041
1. Install new gasket (Figure 1, Item 11) on starter (Figure 1, Item 1).
2. Install starter (Figure 1, Item 1), three new lockwashers (Figure 1, Item 13), and bolts (Figure 1, Item 12) on
engine. Torque bolts to 105 to 120 lb-ft (142 to 163 Nm).
3. Install wire (Figure 1, Item 10), new lockwasher (Figure 1, Item 9), and nut (Figure 1, Item 8) on starter (Figure
1, Item 1).
4. Install two wires (Figure 1, Item 7), new lockwasher (Figure 1, Item 6), and nut (Figure 1, Item 5) on starter
(Figure 1, Item 1).
5. Install cable (Figure 1, Item 14), lockwasher (Figure 1, Item 16), and nut (Figure 1, Item 15) on starter (Figure
1, Item 1).
6. Install two cables (Figure 1, Item 4), new lockwasher (Figure 1, Item 3), and nut (Figure 1, Item 2) on starter
(Figure 1, Item 1).
7. Install engine access panels (WP 0005).
END OF TASK
END OF WORK PACKAGE
0041-3/(4 blank)