• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Yoke and Drum Assembly.
SERVICE BRAKES REPLACEMENT/REPAIR

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  504    505    506    507    508  509  510    511    512    513    514  
img
. .
TM 5-3805-255-14
0058
INSTALLATION
00058
1. Connect transmission-to-transfer drive propeller shaft (Figure 11, Item 1) to transfer drive yoke (Figure 11,
Item 3). Install bolts (Figure 11, Item 2) and tighten to 177 lb-ft (240 Nm)
NOTE
Ensure adjustable top of brake handle is fully counterclockwise prior to connecting
linkage.
2. Connect parking brake linkage (WP 0057).
3. Adjust parking brake linkage (WP 0057).
Figure 11. Transmission to Transfer Drive.
0058
END OF TASK
END OF WORK PACKAGE
0058-9/(10 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.