TM 5-3805-258-24-19SOB HYDRAULIC SYSTEMSPECIFICATIONSLIFT KICKOUT ADJUSTMENT PROCEDURE1. Lift the bucket to the desired height.2. Adjustmagnetaesembly (1) on lift arm(3) so that the lower edge ofthe magnet ie even with the lower edge of switch assembly (2).3. Adjust switch assembly (2) to get clearance (A)between theswitch andmagnet assembly (l)of 6to 10mm(.24to .39 in.).4. Tighten the bolts that hold the magnetaaaembly in place.BUCKET POSITIONER ADJUSTMENTPROCEDURE1. With the engine running, move the tilt control lever to put the bucketin the correct angle to dig and thenmove the tilt lever to the HOLDposition. Lower the bucket to the ground and stop the engine.2. Make sure that magnet aaeembly (2) haa its longerlengthperpendi-cular (in a vertical position) to tube assembly (1). Tighten the aetecrewa in the magnetassembly.3. Measure dimeneion (A) between magnetassembly (2) and switchaseembly (4). The corr~t dimension is 6 to 10 mm (.24to .39 in.).4. To changedimension (A),loosen bolts (6) thentighten screw (5)juetenough and move tube aaaembly ( 1) and the switch awayfrommagnet assembly (2). Switch assembly (4) and cover (3) mustbevertically centered with magnetassembly (2).5. Move tube aasembly (1) until the frontedge of switch asaembly (4)is even (flueh) with the front edge of magnetassembly (2).6. Loosen screw (5) and tighten two bolts(6). Tghten the locknuton screw(5) to a torque of . . . . . . . . 15 * 4 N“m (11 * 3 Ib.ft.)2-70
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business