TM 5-3805-258-24-2ENGINE10.11.12.Make sure each hole in top tank (10) is clean.Put liquid soap on the sealing areas of the toptank for the seals. Install top tank (10). Makesure each core is in alignment with the holesin the top tank. Carefully push top tank (10)into position on the cores. Install the boltsthat hold the channels to the top tank.Make an adjustment to the cores to get a gap(X) of .25 in. (6.4 mm) between the bevelend of the cores (grille side).Tighten straps (8) as the adjustments aremade. Tighten the remainder of the boltsthat hold the cores and top tank in place.DISASSEMBLY AND ASSEMBLY13. Install baffle assemblies (11) and (12).5-48l
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business