TM 5-3805-258-24-2VEHICLE SYSTEMSDISASSEMBLY AND ASSEMBLY89.LOADER CONTROL VALVESConnect four hose assemblies (6) to the controlvalves.Connect hose assembly (7) to the bottom of thecontrol valves.10. Install cover (8) and the nuts that hold it.11.12.Use machine hydraulics to lift the loader frameand remove tooling (A). Lower the bucket tothe ground.Remove the air from the hydraulic system. SeeREMOVE THE AIR FROM THE HY-DRAULIC SYSTEM.5-329
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business