TM 5-3805-258-24-2
VEHICLE SYSTEMS
DISASSEMBLY AND ASSEMBLY
19.
20.
21.
22.
23.
24.
25.
PILOT AND HYDRAULIC PUMP
Install cartridge assembly (9) on the shaft as-
sembly.
Make an alignment of the dowels in the car-
tridge and the holes in the housing. Install
housing (24) on the body.
Install the bolts that hold the housing to the
body and tighten them ot a torque of 203 ± 14
N-m (150 ± 10 lb. ft.).
Do Steps 1 through 10 again for the assembly
of cartridge (25).
Install cartridge (25) in the cover group as
shown.
Install seal ring (27) and O-ring seal (26) in the
body.
Install body (28) on the cover group. Install the
bolts and tighten them to a torque of 95 ± 7
N-m (70 ± 5 lb. ft.).
5-405