TM 5-3805-258-24-2VEHICLE SYSTEMSHAND14. Install O-ring seal (26) on the cap.15. Put cap (25) in position on the gerotor assem-bly.NOTE: The bolts that hold the cap and gerotorassembly to the pump body must be dry when in-stalled.16. Install the bolts that hold the cap and gerotorassembly to the pump body. Tighten the boltsas follows:a)b)a)Tighten the bolts in number sequence to atorque of 14 ± 3 N.m (10 ± 2 lb.ft.).Tighten the bolts again in number sequenceto a torque of 28 ± 3 N.m (21 ± 2 lb. ft).end by:install hand metering pumpDISASSEMBLY AND ASSEMBLYMETERING PUMP5-440
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business