TM 5-3805-262-20
INSTALLATION (SHEET 3 OF 3)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
I f n e c e s s a r y, i n s t a l l n e w 0 - r i n g ( 1 2 ) o n f i t t i n g s ( 1 1 ).
I n s t a l l f i t t i n g s ( 1 1 ) i n c o n t r o l v a l v e c l a m c y l i n d e r p o r t s ; t i g h t e n s e-
c u r e l y.
Position tubes (9 and 10) in loader.
Install clamp (8) on tubes (10 and 9). Secure clamp (8) using capscrew
(7), lock washer (6), and nut (5).
Connect tube fittings (4
Connect and tighten hose
F i l l h y d r a u l i c r e s e r v o i r
Start and operate engine
With engine operating at
times to remove air from
turn off engine.
Check for oil leakage at
s a r y.
a n d 3 ) t o f i t t i n g s ( 1 1 ) ; t i g h t e n s e c u r e l y.
fittings (1 and 2) to tubes (9 and 10).
with oil (page 11-79).
a t i d l e s p e e d.
idle speed, extend and retract cylinders two
hydraulic system, Lower bucket to ground and
all connections. Tighten connections as neces-
Check hydraulic reservoir oil level; add oil if necessary (page 11-78).
Install engine right side panels (page 9-17).
11-41