TM 5-3805-262-20
11-3. LINES AND FITTINGS MAINTENANCE (CONT)
c. Control Valve Assembly to Loader Bucket Assembly (cont).
INSTALLATION (SHEET 1 OF 3)
(1)
(2)
(3)
(4)
(5)
Position hoses (40 and 42) between
rear of loader bucket assembly and
f r o n t o f l o a d e r.
Connect and tighten hose fittings (41
and 39) to tees located on rear of
loader bucket assembly.
Install two clamps (36 and 31) on tube (37).
Position tube (37) on left side of loader arm. Position clamp (36) on
welded bracket. Install and tighten capscrew (35), washer (34), lock
washer (33), and nut (32).
Position clamp (31) on welded bracket and install and tighten capscrew
(30), washer (29), lock washer (28), and nut (27).
11-38