TM 5-3805-262-20
INSTALLATION (SHEET 2 OF 2)
(5)
(6)
(7)
( 8 )
(9)
At starter solenoid BAT terminal, c o n n e c t s t a r t e r r e l a y c a b l e , b a t t e ry
positive cable, and cable (5) using lock washer (2) and nut (l). Tighten
nut to 20 to 25 lb - ft.
At auxiliary steering pump and motor, at bottom relay terminal, connect
cable (5) using nut (3) and lock washer (4).
At bottom motor terminal, connect cable (8) using nut (6) and lock washer
( 7 ) .
At motor mounting bracket, connect cable (8) using capscrew (11), lock
washer (10), and nut (9).
At motor relay center terminals, connect wire (16) and white-black wire
as tagged using two nuts (12) and lock washers (13).
(10) At base of motor relay, connect wire (16) using screw (14) and lock
washer (15).
(11) Spray terminals at starter solenoid and auxiliary steering pump and motor
with electrical cleaner and allow to air dry. Then spray terminals with
e l e c t r i c a l s e a l e r .
( 1 2 ) I n s t a l l e n g i n e l e f t f r o n t s i d e p a n e l ( p a g e 9 - 1 7 ).
(13) Connect and tight en battery ground cable (page 5-151).
5-91