TM 5-3805-262-20INSTALLATION (SHEET 2 OF 2)(5)(6)(7)( 8 )(9)At starter solenoid BAT terminal, c o n n e c t s t a r t e r r e l a y c a b l e , b a t t e rypositive cable, and cable (5) using lock washer (2) and nut (l). Tightennut to 20 to 25 lb - ft.At auxiliary steering pump and motor, at bottom relay terminal, connectcable (5) using nut (3) and lock washer (4).At bottom motor terminal, connect cable (8) using nut (6) and lock washer( 7 ) .At motor mounting bracket, connect cable (8) using capscrew (11), lockwasher (10), and nut (9).At motor relay center terminals, connect wire (16) and white-black wireas tagged using two nuts (12) and lock washers (13).(10) At base of motor relay, connect wire (16) using screw (14) and lockwasher (15).(11) Spray terminals at starter solenoid and auxiliary steering pump and motorwith electrical cleaner and allow to air dry. Then spray terminals withe l e c t r i c a l s e a l e r .( 1 2 ) I n s t a l l e n g i n e l e f t f r o n t s i d e p a n e l ( p a g e 9 - 1 7 ).(13) Connect and tight en battery ground cable (page 5-151).5-91
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business