TM 5-3805-262-20NOTEI n f o l l o w i n g p a r a g r a p h s , r e s o u r c e s r e q u i r e d a r e n o t l i s t e d u n l e s s t h e ya p p l y t o t h e p r o c e d u r e. Personnel required are listed only if the taskrequires more than one. If PERSONNEL REQUIRED is not listed it means oneperson can do the task. The normal standard equipment condition to starta m a i n t e n a n c e t a s k i s l o a d e r b u c k e t l o w e r e d t o g r o u n d , e n g i n e o f f,l o a d e r p a r k e d o n a l e v e l s u r f a c e , ignition key switch in off position,and parking brake applied. EQUIPMENT CONDITION is not listed unless someother condition is required besides those indicated above.10-1. AIR HORN VALVE ASSEMBLY MAINTENANCEThis task covers removal, disassembly, cleaning, inspection, reassembly, testing,and installation of the air horn valve assembly.TOOLS: No. 1 Common Organizational Maintenance Tool KitFixed open end wrench setSocket wrench set, 3/8 inch driveAir fitting, l/4NPTFMATERIALS/PARTS: Clean cloths (Appendix C, item 1)Cleaning solvent P-D-680 (Appendix C, item 2)Detergent (Appendix C, item 3)PERSONNEL REQUIRED: Two Construction Equipment Mechanics M0S 62BNOTEPRELIMINARY PROCEDURE: Front access door unlocked and open, air reser-v o i r d r a i n v a l v e o p e n e d , a n d f l o o r m a t p u l l e d b a c k f o r a c c e s s t o a irhorn valve assembly mounting hardware.REMOVAL (SHEET 1 OF 2)a .b .c .d .e .f .Using clean cloth, remove dirt and grease from air horn valve assembly andimmediate area.At air horn valve assembly, beneath front chassis floor plate, loosen nut (1)and disconnect tube (3) from elbow (4).If necessary, remove elbow (4) from air horn valve assembly.I f n e c e s s a r y, loosen nut (5) and disconnect tube (3) from fitting (7). Removetube from loader.I f n e c e s s a r y , r e m o v e f i t t i n g ( 7 ) .Loosen nut (8) and disconnect tube (10) from fitting (11).10-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business