TM 5-3805-290-23-1
PREPARATION FOR STORAGE OR SHIPMENT - CONTINUED
0208 00
PREPARATION FOR RETURN TO SERVICE FROM LONG-TERM STORAGE - CONTINUED
10.
On the first day of returning to operation, check entire engine several times for leaks and correct operation. The quality
of oil control components used in engines is such that, following engine storage, only an operational check at initial start
is necessary before operation. This operational check ensures correct pressures and temperatures are kept in lubrication,
cooling, and fuel systems, and leaks are detected. To be sure of a safe, uniform check at initial start, use this procedure:
(1)
Disconnect fuel injection pump electrical connector (WP 0164 00) and crank engine until engine oil pres-
sure is present.
(2)
Reconnect fuel injection pump electrical connector (WP 0164 00) and start engine and allow it to run for
(3)
(4)
(5)
Check frequently for leaks such as oil, coolant, and fuel during first few hours of operation. Repair any
leaks as soon as they are detected.
PREPARATION FOR SHIPMENT
0208 00
1.
2.
Perform Unit PMCS (WP 0019 00 and WP 0020 00).
3.
Schedule next PMCS on ULLS-G (Unit Level Logistics System Ground).
4.
Seal exhaust stack opening and engine air cleaner precleaner opening with Tape, pressure sensitive adhesive (Item 56,
5.
END OF WORK PACKAGE
0208 00-7/(0208 00-8 Blank)