• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT RELIEF VALVE REPLACEMENT - CONTINUED
IMPLEMENT RELIEF VALVE REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  558    559    560    561    562  563  564    565    566    567    568  
img
TM 5-3805-290-23-2
IMPLEMENT RELIEF VALVE REPLACEMENT - CONTINUED
0125 00
INSTALLATION - CONTINUED
4.
Install three new O-rings (20) on pressure reducing
valve (18).
5.
Install four new back-up O-rings (19) on pressure
reducing valve (18).
427-B1031
6.
Install pressure reducing valve (18) in implement
relief valve block (2). Tighten pressure reducing valve
to 27 2 lb-ft (37 3 Nm).
427-B1030
0125 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.