10
TM 5-3805-290-23-2
PILOT OIL ACCUMULATOR MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation, Testing and Charging
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Unit
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
Tools and Special Tools
O-ring
Shop equipment, common no. 1 (Item 77, WP 0205
Personnel Required
MOS 62B, Construction Equipment Repairer
References
Nitrogen gas charging system (Item 50, WP 0205
Test stand, automotive (gage set) (Item 92, WP
Equipment Conditions
Hydraulic system pressure relieved (TM 5-3805-
290-10)
Materials/Parts
Lower right panel between cab and engine access
Steering frame lock connected (TM 5-3805-290-
Nitrogen technical dry cylinder (Item 30, WP 0206
10)
Drawings Required
TM 5-3805-290-23P, Figure 133
Oil, lubricating, OEA-30, Arctic (Item 32, WP
Estimated Time to Complete Task
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
2.0 hr
WARN I N G
DO NOT disconnect or remove any hydraulic system line or fitting unless engine is shut down and hydraulic
system pressure has been relieved. Tighten all connections before applying pressure. Escaping hydraulic fluid
under pressure can penetrate the skin, causing injury to personnel.
To prevent injury to personnel, wear protective eye covering and gloves.