• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT RELIEF VALVE REPLACEMENT - CONTINUED
PILOT OIL ACCUMULATOR MAINTENANCE

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  559    560    561    562    563  564  565    566    567    568    569  
img
TM 5-3805-290-23-2
IMPLEMENT RELIEF VALVE REPLACEMENT - CONTINUED
0125 00
INSTALLATION - CONTINUED
7.
Install four new O-rings (17) and connectors (16) on implement relief valve block (2).
8.
Install new O-ring (15) and elbow (14) on implement relief valve block (2).
9.
Install four new O-rings (13) and Ts (12) on implement relief valve block (12).
10.
Install new O-ring (11) and sampling valve (10) on implement relief valve block (2).
11.
Position implement relief valve block (2) on machine and install washer (7) and bolt (6) through clips (8 and 9) and
implement relief valve block. Secure assembly with washer (5) and nut (4).
12.
Install seven new O-rings (3) and connect two hose assemblies (1) to implement relief valve block (2).
427-B0725
13.
Check hydraulic fluid level (TM 5-3805-290-10).
14.
Run engine until normal operating temperature is reached (TM 5-3805-290-10).
15.
Shut down engine (TM 5-3805-290-10).
16.
Check for hydraulic leaks.
END OF WORK PACKAGE
0125 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.