• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
IMPLEMENT HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
IMPLEMENT HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  600    601    602    603    604  605  606    607    608    609    610  
img
TM 5-3805-290-23-2
IMPLEMENT HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0131 00
REMOVAL - CONTINUED
Lift Arm
1.
Disconnect hose (27) from coupling (32) and remove
hose from machine.
2.
Remove and discard O-ring (33).
3.
Disconnect line (34) from coupling (32).
4.
Remove and discard O-ring (33).
5.
Remove coupling (32) from bracket (35).
427-B1125
6.
Remove two bolts (36) and washers (37) from two
clamps (38) and remove clamps from machine.
427-B1126
0131 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.