• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SEPARATE LOADER FRAME AND REAR FRAME (ARTICULATION PIVOT PINS) REPLACEMENT - CONTINUED
SEPARATE LOADER FRAME AND REAR FRAME (ARTICULATION PIVOT PINS) REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1023    1024    1025    1026    1027  1028  1029    1030    1031    1032    1033  
img
TM 5-3805-290-23-2
SEPARATE LOADER FRAME AND REAR FRAME
(ARTICULATION PIVOT PINS REPLACEMENT) - CONTINUED
0183 00
CONNECTION - CONTINUED
31.
Install upper cap (54), lower cap (55), three washers
(53), and bolts (52) on machine.
32.
Use drive plate with nut and bolt to check rolling
torques of two bearings.
33.
Add or remove shims (58) until rolling torque of each
bearing is between 25 lb-in. and 99 lb-in. (2.8 Nm and
11.2 Nm).
427-B0480
34.
Install remaining three washers (53) and bolts (52) on
upper cap (54).
427-B0463
0183 00-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.