• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT TILT LEVER AND LINK REPLACEMENT - CONTINUED
FRONT TILT LEVER AND LINK REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  1155    1156    1157    1158    1159  1160  1161    1162    1163    1164    1165  
img
TM 5-3805-290-23-2
FRONT TILT LEVER AND LINK REPLACEMENT - CONTINUED
0199 00
REMOVAL - CONTINUED
26.
Using puller assembly, remove and discard bearing
sleeve (35) from remaining end of link assembly (23).
Repeat for opposite side of bore.
427-B0636
INSTALLATION
N OT E
Apply a thin coat of clean oil to all O-rings and seals before installation.
1.
Using puller assembly, install new bearing sleeve (35) to a depth of 0.39 + 0.08 in. (10 + 2.0 mm) into link assembly
(23). Repeat for opposite side of bore.
2.
Use bushing driver set to install new lip seal (34) into
link assembly (23). Repeat for opposite side of bore.
427-B0635
0199 00-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.