• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
High Pressure Cutoff (Testing and Adjusting)
Hydraulic Fan Speed (Testing and Adjusting)

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  977    978    979    980    981  982  983    984    985    986    987  
img
TM 5-3805-291-23-1
BRAKE SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS - CONTINUED
0015 00
HYDRAULIC FAN SPEED TEST AND ADJUSTMENT - CONTINUED
High Pressure Cutoff (Testing and Adjusting) - Continued
3.
With assistance, start and run engine at high idle (TM 5-3805-291-10).
N OT E
Pressure at pump discharge port should
be 2,700 psi (18,800 kPa).
4.
If pressure at pump discharge port is not 2,700 psi
(18,800 kPa), remove cap from high pressure spool
(33) on pump compensator (30).
5.
Continue to run machine at high idle.
6.
Adjust high pressure spool (33) until gage reads 2,700
psi (18,800 kPa) by turning it clockwise to increase and
counterclockwise to decrease.
427-C1455
7.
Install cap on high pressure spool (33).
8.
Connect fan solenoid connector (31) to fan solenoid (32).
0015 00-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.