• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RELIEF VALVE (MAIN, LOAD SENSING) TEST AND ADJUSTMENT
RELIEF VALVE (MAIN, LOAD SENSING) TEST AND ADJUSTMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1060    1061    1062    1063    1064  1065  1066    1067    1068    1069    1070  
img
TM 5-3805-291-23-1
HYDRAULIC SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS - CONTINUED
0017 00
RELIEF VALVE (MAIN, LOAD SENSING) TEST AND ADJUSTMENT - CONTINUED
5.
Ensure control levers are in HOLD position.
6.
To relieve pressure in hydraulic tank (22), press and hold plunger on breaker relief valve (23).
427-C0935
7.
Install test stand on remote main relief valve (26) pressure tap (27).
427-C0954
427-C0956
0017 00-56


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.