• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VALVE COVER AND BASE REPLACEMENT - CONTINUED
VALVE COVER AND BASE REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1164    1165    1166    1167    1168  1169  1170    1171    1172    1173    1174  
img
TM 5-3805-291-23-1
VALVE COVER AND BASE REPLACEMENT - CONTINUED
0024 00
REMOVAL - CONTINUED
CAU T I ON
Wipe area clean around all connections to be opened during removal. Cap lines and hoses and plug open-
ings after removing lines. Contamination of system could result in premature failure.
N OT E
Tag hoses prior to removal to ensure correct installation.
Use a container to catch any fluid that may drain from hoses or system. Dispose of fluid IAW local pol-
icy and ordinances. Ensure all spills are cleaned up.
6.
Loosen clamp (15) and disconnect hose (16) from
valve cover base (10).
7.
Remove 15 bolts (17), washers (18), and clamp loop
(19) from valve cover base (10).
427-C0107
8.
Remove valve cover base (10) and gasket (20) from machine. Discard gasket.
427-C0108
0024 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.