• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COOLING SYSTEM LINES REPLACEMENT
COOLING SYSTEM LINES REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1266    1267    1268    1269    1270  1271  1272    1273    1274    1275    1276  
img
TM 5-3805-291-23-1
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
0043 00
REMOVAL
1.
Loosen clamp (1) and disconnect hose (2) from T (3).
2.
Remove T (3) from machine.
3.
Loosen clamp (4) and remove hose (2) and O-ring (5) from machine. Discard O-ring.
4.
Loosen clamp (6) and disconnect hose (7) from T (8). Remove and discard O-ring (9).
5.
Remove T (8) from radiator top tank (10).
6.
Disconnect hose (11) from radiator filler cap (12) and pull hose through retaining clip (13).
7.
Loosen clamp (14) and disconnect hose (15) from cooling package assembly.
8.
Loosen clamp (16) and disconnect hose (17) from cooling package assembly.
427-C0386
0043 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.