• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
COOLING SYSTEM LINES REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1271    1272    1273    1274    1275  1276  1277    1278    1279    1280    1281  
img
TM 5-3805-291-23-1
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
0043 00
INSTALLATION
N OT E
Apply a thin coat of clean antifreeze to all O-rings prior to installation.
1.
Connect hoses (48 and 46) to heater core (53).
2.
Position clip (52) and install washer (51) and nut (50).
3.
Install clip (49) on cab wall.
4.
Connect hose (48) to tube (44) and tighten two clamps (47).
5.
Connect hose (46) to tube (42) and tighten two clamps (45).
6.
Connect hose (37) to tube (44) and tighten clamp (43).
7.
Connect hose (34) to tube (42) and tighten clamp (41).
8.
Install four washers (39) and bolts (38) on clips (40).
9.
Connect hose (37) to engine block and tighten clamp (36).
10.
Connect hose (34) to water pump (35) and tighten clamp (33).
427-C0390
0043 00-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.