• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TURNLAMP SWITCH REPLACEMENT
TURNLAMP SWITCH REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  106    107    108    109    110  111  112    113    114    115    116  
img
TM 5-3805-291-23-2
TURNLAMP SWITCH REPLACEMENT - CONTINUED
0066 00
REMOVAL - CONTINUED
1.
Remove plate (1) from lever (2).
2.
Remove screw (3) and washer (4) from turnlamp lever
(2).
3.
Remove lever (2) from turnlamp switch (5).
4.
Remove four screws (6), washers (7), and cover (8)
from turnlamp switch (5).
427-C1314
0066 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.