• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY CABLES REPLACEMENT - CONTINUED
BATTERY CABLES REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  211    212    213    214    215  216  217    218    219    220    221  
img
TM 5-3805-291-23-2
BATTERY CABLES REPLACEMENT - CONTINUED
0097 00
REMOVAL - CONTINUED
18.
Remove two nuts (38), washers (39), and disconnect positive cables (40) from junction block (30).
19.
Remove two bolts (41) and washers (42) from NATO slave receptacle (43).
20.
Remove three bolts (44), washers (45), five clamps (46), two positive cables (40), and cable (47) from machine.
0097 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.