• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY CABLES REPLACEMENT - CONTINUED
BATTERY CABLES REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  214    215    216    217    218  219  220    221    222    223    224  
img
TM 5-3805-291-23-2
BATTERY CABLES REPLACEMENT - CONTINUED
0097 00
INSTALLATION - CONTINUED
10.
Install cable (47), two positive cables (40), five clamps (46), three washers (43), and bolts (44).
11.
Install two washers (42) and bolts (41) on NATO slave receptacle (43).
12.
Install two positive cables (40), washers (39), and nuts (38) on junction block (30).
0097 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.