10
TM 5-3805-291-23-2
BRAKE ACCUMULATOR MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation, Testing, Charging
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Unit
Test Equipment
O-ring (12)
Test set, electronic systems (MSD) (Item 86, WP
Personnel Required
Tools and Special Tools
MOS 62B, Construction Equipment Repairer (2)
Tool kit, general mechanic's, automotive (Item 90,
Equipment Conditions
Shop equipment, automotive maintenance and
Machine parked on level ground (TM 5-3805-291-
repair: organizational maintenance, common no.
10)
Work tool lowered to ground (TM 5-3805-291-10)
Parking brake engaged (TM 5-3805-291-10)
Wheels chocked
Battery disconnect switch in OFF position (TM 5-
Materials/Parts
3805-291-10)
Steering frame lock connected (TM 5-3805-291-
Cleaning compound, solvent, type III (Item 7, WP
10)
Brake system pressure relieved (TM 5-3805-291-
Nitrogen technical dry cylinder (Item 25, WP 0233
10)
00)
Oil, lubricating, OE/HDO-5/40 (Item 27, WP 0233
Drawings Required
00)
TM 5-3805-291-23P, Figures 101 and 102
Oil, lubricating, OE/HDO-15/40 (Item 28, WP
Estimated Time to Complete Task
Oil, lubricating, OEA-30, Arctic (Item 29, WP
3.0 hr