• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT FENDERS REPLACEMENT - CONTINUED
REAR FENDERS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  479    480    481    482    483  484  485    486    487    488    489  
img
. . . . . . . . . .
4
TM 5-3805-291-23-2
REAR FENDERS REPLACEMENT
0137 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Maintenance Level
Unit
MOS 62B, Construction Equipment Repairer (2)
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanic's, automotive (Item 90,
Handrails removed (WP 0134 00)
WP 0232 00)
Steering frame lock connected (TM 5-3805-291-
Shop equipment, automotive maintenance and
10)
repair: organizational maintenance, common no.
1 (Item 70, WP 0232 00)
Windshield washer bottle removed (right-hand
fender only) (WP 0144 00)
Bracket, link (Item 15, WP 0232 00) (3)
Lifting equipment, 350-lb capacity
Drawings Required
Materials/Parts
TM 5-3805-291-23P, Figure 131
Cleaning compound, solvent, type III (Item 7, WP
Estimated Time to Complete Task
0233 00)
1.2 hr
Rag, wiping (Item 35, WP 0233 00)
0137 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.