TILT CYLINDERS REPLACEMENT - CONTINUED
TILT CYLINDERS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  575    576    577    578    579  580  581    582    583    584    585  
img
TM 5-3805-291-23-2
TILT CYLINDERS REPLACEMENT - CONTINUED
0152 00
INSTALLATION - CONTINUED
5.
Position two new O-rings (16), hose assemblies (11
and 4), and four flange halves (15) on machine and
install eight washers (14) and bolts (13) on hose
assemblies.
6.
Position new gasket (12), hose assembly (11), and two
flange halves (10) on machine and install four washers
(9) and bolts (8).
427-C0538
0152 00-9