TM 5-3805-291-23-2
MAIN CONTROL VALVE AND IMPLEMENT PUMP HYDRAULIC
HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0157 00
REMOVAL - CONTINUED
1.
Disconnect wiring harness (1) from main hydraulic control valve (2).
2.
Remove eight bolts (3), washers (4), and two gaskets (5) from two third function hoses (6) and disconnect hoses from
main hydraulic control valve (2). Discard gaskets.
3.
Remove 16 bolts (7), washers (8), and four gaskets (9) from four lift cylinder hoses (10 and 11) and disconnect hoses
from main hydraulic control valve (2). Discard gaskets.
4.
Remove eight bolts (12), washers (13), and two gaskets (14) from two tilt cylinder hoses (15) and disconnect hoses from
main hydraulic control valve (2). Discard gaskets.
5.
Disconnect hose (16) from main hydraulic control valve (2). Remove O-ring (17) from hose (16). Discard O-ring.
6.
Disconnect tube (18) from main hydraulic control valve (2) and fitting (19). Remove two O-rings (20) from tube. Dis-
card O-rings.
7.
Remove fitting (19) from machine. Remove O-ring (21) from fitting. Discard O-ring.
8.
Remove eight hoses (6, 10, 11, and 15) from machine (WP 0156 00).
0157 00-3