• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAIN CONTROL VALVE AND IMPLEMENT PUMP HYDRAULIC HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
MAIN CONTROL VALVE AND IMPLEMENT PUMP HYDRAULIC HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  634    635    636    637    638  639  640    641    642    643    644  
img
TM 5-3805-291-23-2
MAIN CONTROL VALVE AND IMPLEMENT PUMP HYDRAULIC
HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0157 00
REMOVAL - CONTINUED
20.
Remove four bolts (49) and washers (50) and disconnect hose (28) from hose (51). Remove hose (28) from machine.
Remove O-ring (52) from hose. Discard O-ring.
21.
Remove four bolts (53) and washers (54) and remove hose (32) from coupling (55). Remove grommet (56) from hose.
22.
Disconnect hose (16) from fitting (57) and remove hose from machine. Remove O-ring (58) from hose. Discard O-ring.
23.
Disconnect hose (23) from test port (59) and remove hose from machine. Remove O-ring (60) from hose (23). Discard
O-ring.
24.
Remove test port (59) from fitting (61). Remove O-ring (62) from test port. Discard O-ring.
427-C1300
0157 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.