• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER INSTALLATION - CONTINUED
ARCTIC HEATER INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  692    693    694    695    696  697  698    699    700    701    702  
img
TM 5-3805-291-23-2
ARCTIC HEATER INSTALLATION - CONTINUED
0162 00
INSTALLATION - CONTINUED
38.
Loosen clamp (64) and disconnect hose (65) from heater valve (67).
39.
Remove heater valve (67) with O-ring (57) from fitting (66).
40.
Install heater valve (67) and O-ring (57) in T (68).
41.
Install T (68) and O-ring (57) in fitting (66) and position as shown.
42.
Install valve (58) and O-ring (57) in T (68).
43.
Install elbow (56) and O-ring (57) in valve (58).
44.
Install fitting (54) and O-ring (57) in elbow (56).
45.
Install connector (53) in fitting (54).
46.
Connect hose (69) to connector (53) and tighten clamp (64).
0162 00-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.