• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER INSTALLATION - CONTINUED
ARCTIC HEATER INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  696    697    698    699    700  701  702    703    704    705    706  
img
TM 5-3805-291-23-2
ARCTIC HEATER INSTALLATION - CONTINUED
0162 00
INSTALLATION - CONTINUED
53.
Connect fuel hose (32) with O-ring (83) to fitting (82).
54.
Connect hose (69) to fitting (81) and tighten clamp (64).
55.
Connect hose (52) to fitting (81) and tighten clamp (64).
56.
Connect arctic heater (77) to arctic heater harness (72).
57.
Install clamp (84) around hoses (52 and 69), fuel hose, (32), and arctic heater harness (72) and secure to rear panel (2)
with bolt (5) and washer (6).
0162 00-22


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.