• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER INSTALLATION - CONTINUED
ARCTIC HEATER INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  694    695    696    697    698  699  700    701    702    703    704  
img
TM 5-3805-291-23-2
ARCTIC HEATER INSTALLATION - CONTINUED
0162 00
INSTALLATION - CONTINUED
50.
Install grommet (76) in arctic heater case (10).
51.
Route two coolant hoses (69 and 52), fuel hose (32), and arctic heater harness (72) through grommet (76) in arctic heater
case (10).
0162 00-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.