• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE OIL PUMP REPLACEMENT - CONTINUED
PISTON COOLING JETS REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  839    840    841    842    843  844  845    846    847    848    849  
img
.
TM 5-3805-291-23-2
ENGINE OIL PUMP REPLACEMENT - CONTINUED
0182 00
INSTALLATION - CONTINUED
8.
Install two new O-rings (4) on tube assemblies (3).
9.
Install two tube assemblies (3) on elbow (5).
10.
Install four washers (2) and bolts (1) on tube assembly
flange halves (3).
427-C1027
11.
Install engine oil pan (WP 0181 00).
12.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
13.
Shut down engine (TM 5-3805-291-10).
14.
Check for leaks.
END OF WORK PACKAGE
0182 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.