• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INTAKE MANIFOLD REPLACEMENT - CONTINUED
IDLER GEARS REPLACEMENT

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  848    849    850    851    852  853  854    855    856    857    858  
img
TM 5-3805-291-23-2
INTAKE MANIFOLD REPLACEMENT - CONTINUED
0185 00
INSTALLATION - CONTINUED
8.
Connect two wiring harnesses (10) to sensors (11).
9.
Place bracket (8) in position on stud (9).
10.
Install washer (7) and nut (6) on stud (9).
11.
Install bracket (3), two clamps (5), and hoses (4) on
machine.
12.
Install washer (2) and bolt (1) on stud (4).
427-C1030
13.
Install air intake assembly hoses (WP 0034 00).
14.
Install ether atomizer, if removed (WP 0037 00).
15.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
16.
Shut down engine (TM 5-3805-291-10).
17.
Check for leaks.
END OF WORK PACKAGE
0185 00-5/(0185 00-6 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.