• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Torque Converter
TRANSMISSION AND TORQUE CONVERTER REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1010    1011    1012    1013    1014  1015  1016    1017    1018    1019    1020  
img
TM 5-3805-291-23-2
TRANSMISSION AND TORQUE CONVERTER REPLACEMENT - CONTINUED
0204 00
INSTALLATION - CONTINUED
Torque Converter - Continued
0204 00
3.
Install 12 washers (33) and bolts (32) on torque converter (16) and transmission (21).
.
427-C0990
Transmission Assembly
0204 00
1.
Install link bracket with 19 mm bolt on top of torque converter.
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting equipment used is in good condition and of suitable load capacity. Keep
clear of heavy parts supported only by lifting equipment. Failure to follow this warning may result in injury
or death to personnel.
N OT E
Combined transmission assembly weighs 2,200 lb (998 kg).
0204 00-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.