0204 00
INSTALLATION - CONTINUED
Transmission Assembly - Continued
0204 00
18.
Install new O-ring (3) in test port line (1) and connect
line assembly to fitting (2).
427-C0975
19.
Install rear oil cooler line (WP 0102 00).
20.
Install handrails (WP 0134 00).
21.
Install fill tube (WP 0103 00).
22.
Install rear drive shaft (WP 0110 00).
23.
Install center drive shaft (WP 0107 00).
24.
Install secondary steering control valve (WP 0126 00).
25.
Install steering control valve (WP 0127 00).
26.
Install hydraulic tank (WP 0159 00).
27.
Install implement piston pump (WP 0216 00).
28.
Install cab (WP 0132 00).
29.
Refill transmission with clean oil (WP 0100 00).
WAR N I N G
Before operating the machine, secure the steering frame lock in the stowed position. DO NOT operate
machine with steering frame lock connected. Failure to lock steering frame lock into the stowed position
before operating can result in loss of steering and injury or death to personnel.
30.
Secure steering frame lock in stowed position (TM 5-3805-291-10).
31.
Start machine (TM 5-3805-291-10).
32.
Run engine until operating temperature is reached and verify correct operation of machine (TM 5-3805-291-10).
33.
Shut down engine (TM 5-3805-291-10).
34.
Check oil level (TM 5-3805-291-10).
35.
Check transmission for leaks.
END OF WORK PACKAGE