• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FRONT AXLE REPLACEMENT - CONTINUED
FRONT AXLE REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1029    1030    1031    1032    1033  1034  1035    1036    1037    1038    1039  
img
TM 5-3805-291-23-2
FRONT AXLE REPLACEMENT - CONTINUED
0207 00
INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting equipment used is in good condition and of suitable load capacity. Keep
clear of heavy parts supported only by lifting equipment. Failure to follow this warning may result in injury
or death to personnel.
N OT E
Axle weighs approximately 3,395 lb (1,540 kg).
1.
With assistance, attach lifting equipment to each side
of axle (15), as shown.
427-C1036
2.
Use lifting equipment to raise axle (15) to machine.
3.
Install eight washers (20) and bolts (19) on axle (15). Tighten bolts to 1,328 148 lb-ft (1,800 200 Nm).
4.
Place covers (18) in position on each side of machine.
5.
Install two washers (17) and bolts (16) on each cover
(18).
427-C1037
0207 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.