• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE COMPARTMENT SHIELD REPLACEMENT - CONTINUED
WINDSHIELD FRONT/REAR AND DOORS GLASS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1079    1080    1081    1082    1083  1084  1085    1086    1087    1088    1089  
img
. . . . . . .
4
TM 5-3805-291-23-2
WINDSHIELD FRONT/REAR AND DOORS GLASS REPLACEMENT
0213 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Direct Support
Equipment Conditions
Tools and Special Tools
Machine parked on level ground (TM 5-3805-291-
Tool kit, general mechanic's, automotive (Item 90,
10)
WP 0232 00)
Work tool lowered to ground (TM 5-3805-291-10)
Shop equipment, automotive maintenance and
Parking brake engaged (TM 5-3805-291-10)
repair: field maintenance, basic, less power (Item
Wheels chocked
68, WP 0232 00)
Battery disconnect switch in OFF position (TM 5-
3805-291-10)
Materials/Parts
Drawings Required
Cleaning compound, solvent, type III (Item 7, WP
0233 00)
TM 5-3805-291-23P, Figure 130
Rag, wiping (Item 35, WP 0233 00)
Estimated Time to Complete Task
1.5 hr ea
Twine, 20 ft
0213 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.