4
TM 5-3805-291-23-2
WINDSHIELD FRONT/REAR AND DOORS GLASS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Direct Support
Equipment Conditions
Tools and Special Tools
Machine parked on level ground (TM 5-3805-291-
Tool kit, general mechanic's, automotive (Item 90,
10)
Work tool lowered to ground (TM 5-3805-291-10)
Shop equipment, automotive maintenance and
Parking brake engaged (TM 5-3805-291-10)
repair: field maintenance, basic, less power (Item
Wheels chocked
Battery disconnect switch in OFF position (TM 5-
3805-291-10)
Materials/Parts
Drawings Required
Cleaning compound, solvent, type III (Item 7, WP
TM 5-3805-291-23P, Figure 130
Estimated Time to Complete Task
1.5 hr ea
Twine, 20 ft