• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Engine Pre-Heating Cold Start System
Hydraulic System Warm-Up

Operators Manual For M400T And M400W
Page Navigation
  54    55    56    57    58  59  60    61    62    63    64  
img
.
TM 5-3805-292-10
0006
OPERATION IN EXTREME COLD CONTINUED
Heating Cab
1. Remove three bolts (Figure 3, Item 1) and washers (Figure 3, Item 2) from floor plate (Figure 3, Item 3).
2. Remove floor plate (Figure 3, Item 3) from cab.
1
2
3
458-0070
Figure 3. Floor Plate.
0006
NOTE
Valve handle is parallel to hose in ON position.
3. Turn heater/coolant valve (Figure 4, Item 1) to ON position for water to flow through heater core.
1
458-0300
Figure 4. Heater/Coolant Valve (On).
0006
4. Position floor plate (Figure 3, Item 3) in cab.
5. Install three washers (Figure 3, Item 2) and bolts (Figure 3, Item 1).
0006-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.