TM 5-3805-292-10
0020
Table 1. Preventive Maintenance Checks and Services (PMCS)
for the M400T and M400W SSL - Continued.
LOCATION
ITEM TO
CHECK/
ITEM
MAN-
NOT READY/
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
AVAILABLE IF:
3
a. Inspect attachment coupler for
Cracks or breaks are
Before
Attachment
evident. Wear that would
cracks, breaks, or wear.
Coupler and
impair security of coupling
Work Tool
is evident.
Attachment
Figure 2. Front of SSL.
0020
b. If work tool attachment is
installed, ensure two locking
levers are in horizontal locked