• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER EQUALIZER (12-TO-24V) REPLACEMENT
POWER PLUG OUTLET REPLACEMENT

Field Maintenance Manual For M400T And M400W
Page Navigation
  1053    1054    1055    1056    1057  1058  1059    1060    1061    1062    1063  
img
. .
TM 5-3805-292-23
0157
REMOVAL
000157
N OT E
Note positive and negative connecting points. Tag cables prior to removal to ensure
correct installation.
1. Remove three nuts (Figure 1, Item 7), lockwashers (Figure 1, Item 4), washers (Figure 1, Item 5), and cables
(Figure 1, Item 6) from power equalizer (Figure 1, Item 8). Discard lockwashers.
2. Remove four locknuts (Figure 1, Item 1), bolts (Figure 1, Item 2), washers (Figure 1, Item 3), and power equal-
izer (Figure 1, Item 8) from battery compartment. Discard locknuts.
Figure 1. Battery Compartment.
0157
END OF TASK
INSTALLATION
000157
1. Install power equalizer (Figure 1, Item 8), four washers (Figure 1, Item 3), bolts (Figure 1, Item 2), and new
locknuts (Figure 1, Item 3) in battery compartment.
2. Connect three cables (Figure 1, Item 6) and install washers (Figure 1, Item 3), new lockwashers (Figure 1, Item
4) and nuts (Figure 1, Item 7) on power equalizer (Figure 1, Item 8).
END OF TASK
FOLLOW-ON TASKS
000157
1. Install batteries (WP 0141).
2. Verify correct operation of machine (TM 5-3805-292-10).
END OF TASK
END OF WORK PACKAGE
0157-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.